What to consider when hiring a contractor
- Credentials: Check references from clients that your contractor has already completed jobs for. Especially the last two or three projects. You want to know how the contractor has been finishing jobs recently – not a few years ago.
- Licensing: For large commercial greenhouse projects, you want to make sure that the contractor has the necessary license that is required for the project location. Each town generally has its own building department so you want to ensure that your contractor is licensed to build within that town’s department. Example: Boulder Colorado would have it own building department. For a smaller, residential-like projects, you don’t need to worry about your contractor being licensed with the city as long as you have gone through the proper steps to obtain a building permit.
- Financial Status: Research the contractor’s financial stability. Are they able to start and finish the job without any financial problems that could cause delay or prohibit them from finishing the job. This can be done fairly simply by calling the Better Business Bureau and asking if there are any complaints registered against the contractor. You can also check their banking references and local supply houses where they have accounts to see if they pay their bills. It is not necessary to do all of these things but certainly some of them would give you better piece of mind. You must be comfortable with his ability to complete the job in a professional manner, with a good level of professionalism and finish.
- Experience: For larger commercial greenhouses, ask if the contractor has experience with steel frame buildings. Does their crew also have experience with steel frame construction? Can they read plans and follow them? Are they able to do the necessary paperwork in a timely manner? Can they supply a *schedule of values that is real and accurate? Are they capable of making a schedule for the project?
What to consider when you’re bidding out for a contractor:
If you get multiple bids it is important to review and compare the bids for the following. The bids should be itemized with prices, not just a total for all items.
- Completed bid: Are all items covered?
- Variance: Are there wide variances in pricing for specific items in each bid.
- Comparison: How much does the final cost vary from each bidder?
- Clear Allocation: Do the bids show the overhead and profit separately after the actual cost for the construction only?
- Insurance:
- Is there an insurance cost for the job and are you named as an additional insured?
- Is the insurance current and NOT expired?
- Are the limits of the insurance sufficient to cover any liability problems?
- Payment schedule: Is payment, and when the contractor expects payment, mentioned in the bid?
Below is an example Schedule of Values for an 1000 sq. ft. building. While it is strictly an estimate, this schedule is a great resource to use for itemization of project portion and payment. Please note that this list may vary due to site conditions.
Smaller building projects, residential greenhouses for instance, can function under a significantly more simple schedule of values. Oftentimes the client will pay the contractor 50% up front, for labor and materials, and then the other 50% when the project is finished.
Each time a payment is made a waiver of lien should be signed by the contractor. This simply states that they have been paid a portion of the contract and they will use this money to pay any expenses, including labor, for the project. They can also take out their overhead portion and profit from a portion of the amount you paid them.
This is where the schedule of values list they submitted with the bid becomes important. When the contractor requests their second payment, you can check the schedule of values and determine if that amount of work has been accomplished.